The contractor shall provide all labor, tools, parts, materials, equipment, personal protective equipment, transportation, and incidentals required for the repair, rebuilding and re-staining of the Anaconda Conference Room Table (ACRT), and staining to match the current Lectern and built-in cabinets doors located inside the Anaconda Conference Room IAW the attached Performance Work Statement (PWS).