Point Of Contact Not Available
The work shall consist of furnishing and installing 4-Inch PVC force main, 6-Inch Solid Perforated PE (SDR 17) pipe, 18-Inch Solid Perforated PE (SDR 17) Pipe, automated leachate pumps along with miscellaneous connections and fittings and furnishing and installing geo-composite, 60-Mil HDPE Liner, geo-synthetic clay liner, 40-Mil HDPE Liner, re-compacted clay liner, and all other associated work for Phase 2 of Area II-B Subtitle "D" Cell (approximately 6.5 + acres).
Bid Protests Not Available