1. DESCRIPTION OF SERVICES/GENERAL INFORMATION. The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform ash-recycling service for Yokota AB, Japan in accordance with applicable Japanese laws and pertinent regulations, and commercial practices. The Contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS) as attached. The Contractor shall possess all applicable business permits.
1.2.1. Business Permits. The Contractor, as a minimum, shall possess and submit a copy of the valid business permits listed below to perform the services specified in this PWS in conformance with Japanese laws and pertinent regulations:
Required Business Permit: Industrial Waste Treatment Business Permit (ç£æ¥å»æ£ç©å¦åæ¥è¨±å¯)
Item: Bottom Ash (çãæ®»ï¼and Fly Ash (ã°ããã)
Method: Final and/or Intermediate Treatment (Recycling): ï¼æçµå¦åã¾ãã¯ä¸éå¦åï¼
Notice of Pre-Proposal Conference
A pre-proposal conference will be conducted at Contracting Squadron, Bldg. 620 (Conference Room 105 and 106), Yokota Air Base, Tokyo Japan on 17 Jan 2020 at 1430 hours(Japan Standard Time) for the purpose of answering questions regarding this solicitation. Submit the names of all attendees (not to exceed 3 persons) to Mr. Setsuo Yamamoto by e-mail at [email protected] or Ms. Tomoko Shioda at [email protected] prior to 1400 hours, 16 Jan 2020(Japan Standard Time). This information must be provided in advance for ensuring your access to Yokota Air Base and attendance at the conference.
Please see the attached documents more detailed information.
23 Jan 2020, Japanese standard time, Clearance Letter Q A Ash Recycling SV was attached.
24 Jan 2020, Japanese standard time, Minutes of Pre-proposal Conference