Work will involve furnishing all labor, materials, equipment services, quality assurance and construction including but not limited to grinding, cold milling, hauling and disposal of the existing asphalt and concrete and installment of new pavement, excavation for pavement base repair for approximately 22 miles of streets of which 15 miles are in the base bid and approximately 7 miles in additive alternate A, speed hump removal and replacement, raising appurtenances and survey monuments to grade, night work, reconstruction survey monument box, sweeping, installation of curb ramps to meet ADA requirements, sidewalk panel removal and placement, curb and gutter removal and replacement, cross gutter and alley apron removal and replacement, residential driveway replacement, relocation of pedestrian push buttons, installation of new pedestrian push buttons and push button posts, removal and replacement of pedestrian barricades, tree trimming, root pruning, installment of root barriers, tree removal, weed abatement, weed spraying, replacing traffic striping/ markings/ markers/devices, replacing vehicle detector loops and stubs, traffic control drawings and permits, storm drain inlet protection, and installation of inlet markers for various streets throughout the City.
Bid Protests Not Available