State Bid

Last Updated on 30 Nov 2022 at 4 PM
job contract
Barre Vermont

BENNINGTON NH SURF (81) & BENNINGTON NH SURF (82) & POWNAL-BENNINGTON NH SURF (72)

Solicitation ID 57218%27,%20%27Window57218%27);
Posted Date 30 Nov 2022 at 4 PM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Agency Of Transportation Contract Administration
Location Barre Vermont United states
BENNINGTON NH SURF (81): BEGINNING AT THE NEW YORK STATE LINE ON VT ROUTE 279 AT STATION 0+00.00 (MM 0.000) AND EXTENDING EASTERLY ALONG VT ROUTE 279 A DISTANCE OF APPROXIMATELY 34,053.00 FEET (6.449 MILES) TO STATION 340+53.00 (MM 6.449). WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES FINE-MILLING AND OVERLAY PAVING OF THE EXISTING HIGHWAY, PAVEMENT MARKINGS, GUARDRAIL AND OTHER RELATED HIGHWAY ITEMS. ENGINEERS CATEGORY F -------------------------------------------------------------------------------------- BENNINGTON NH SURF (82): BEGINNING ON US ROUTE 7 AT STATION 201+02.00 (MM 3.807) AND EXTENDING NORTHERLY ALONG US ROUTE 7 A DISTANCE OF APPROXIMATELY 10,179.00 FEET (1.928 MILES) TO STATION 302+81.00 (MM 5.735). WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES FINE-MILLING AND OVERLAY PAVING OF THE EXISTING HIGHWAY, GUARDRAIL, PAVEMENT MARKINGS AND OTHER RELATED HIGHWAY ITEMS. ENGINEERS CATEGORY F -------------------------------------------------------------------------------------- POWNAL-BENNINGTON NH SURF (72): BEGINNING AT THE MASSACHUSETTS STATE LINE ON US ROUTE 7 AT STATION 0+00.00 (MM 0.000) AND EXTENDING NORTHERLY ALONG US ROUTE 7 FOR A DISTANCE OF APPROXIMATELY 53,566.00 FEET (10.145 MILES) TO STATION B 113+90.00 (MM 2.157) ENDING IN THE TOWN OF BENNINGTON. WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES FINE-MILLING AND OVERLAY PAVING OF THE EXISTING HIGHWAY, PAVEMENT MARKINGS, GUARDRAIL AND OTHER RELATED HIGHWAY ITEMS. ENGINEERS CATEGORY F
Bid Protests Not Available