Point Of Contact Not Available
Renovations to the City of Birmingham Ice Arena Division 1 General Requirements: N/A Division 2 Site Work and Utilities: Selective Site Demolition, Soil Erosion, Grading, Storm Sewer pipe and Catch basin, Water cut and Cap Landscape Restoration Division 2 Landscaping: Topsoil, Hydroseed and Mulch, Plantings Division 2 Selective Demolition Demolish Rink Concrete Floors, Selective Concrete demolition, Masonry wall and openings, Flooring, Ceilings, Mechanical HVAC Units. Shoring. Division 3 Concrete: Foundations, Ice Rink Slab on Grade, Concrete SOG, SOG patches, Transformer and Mechanical pads Division 4 Masonry: CMU Masonry, Brick Veneer, masonry infill Division 5 Metals: Structural Beams, Lentils, joists deck, RTU frames Division 6 Wood and Plastics: Rough/finish Carpentry, Interior Architectural Woodwork, FRP Division 7 Thermal and Moisture Protection: Waterproofing, Water Repellants, Thermal Insulation, Foamed in Place Insulation, TPO Roofing, Sheet Metal Flashing & Trim, Firestopping, Joint Sealants Division 8 Doors and Windows: Hollow Metal doors and frames, Fiberglass Doors, Coiling Counter Doors, Aluminum Storefronts, Aluminum Windows, Door Hardware, Glass & Glazing Division 9 Finishes: Gypsum Drywall Assemblies, Ceramic Tile Work, Acoustical Ceilings, Resilient Tile and Base, Resilient Athletic Flooring, Painting and coatings Division 10 Specialties: Plastic Signs, Metal Lockers, Solid Plastic Toilet Partitions and Accessories Division 11 Equipment: Dasherboards Division 13 Equipment: Ice Rink General Requirements, Ice Rink Refrigeration System, Ice Rink Floor System, Ice Rink Piping, Ice rink Waste Heat Recovery, Ice Rink Central Control Systems Division 15 Mechanical: Basic HVAC Requirements, Selective Demolition, Cut /Cap, Identification for HVAC Piping and Equipment, Infrared Heaters, ERV’s, Condensing Units, Arid Desiccant Dehumidification Units, Air distribution Systems, Ventilators, Venting, Testing, Adjusting and Balancing, Duct Insulation, Piping Insulation, HVAC Firestopping, Refrigeration Detection Systems, Exhaust Fans, Temperature controls Division 15 Plumbing:, Basic Plumbing Requirements, Cut / Cap for Demolition, UG Sanitary, Waterlines, Gas Lines, Identification, Plumbing Piping Insulation, Plumbing Piping, Plumbing Piping Specialties, Plumbing Fixtures Division 15 Fire Protection; Cut/ Cap existing system, Rework existing Fire Suppression system to confirm to new floor plan Division 16 Electrical: Demolition Cut/ Cap, Basic Electrical Requirements, Selective Demolition, Power, Lighting, Distribution panel Panelboards, Lighting, Low Voltage Raceways, New Service. Division 16 Fire Alarm: Fire alarm modification and conform to new floor plan
Bid Protests Not Available