Naval Underwater Warfare Center (NUWC) Division, Keyport has a requirement to replace a roof top air-handling unit (AHU) and install five ductless split unit systems located at bldg. 1074. The project will require the contractor to remove and replace existing HVAC equipment; provide and install five (5) new ductless split unit systems, install electrical circuits, plumbing, and core drilling as required.