The Contractor shall provide all labor, equipment, tools, material, supervision, and any other items necessary to properly remove and replace, one (1) Trane chiller, one (1) chilled water pump and all supporting equipment. The contractor shall also, following the same requirements, install one (1) 15-ton Trane chiller). *Trane air cooled water chillers. The contractor will be required to provide and install one (1) new properly sized chilled water pump and one (1) BAS line starter to operate the chilled water pump(s) properly. Additionally, the chosen line starter must be able to operate, start/stop and monitor using existing facility controls system.
Please review the attached Statement of Work and specified brand name.
Site Visit will be December 28, 2023 at 09:30 a.m. CST
Q and A will be due January 3, 2024 at 02:00 p.m. CST
Proposals are due January 12, 2023 at 02:00 p.m. CST