BEGINNING IN THE TOWN OF BROWNINGTON ON VT ROUTE 58 AT STATION 75+75.00 (MM 1.435) AND EXTENDING EASTERLY 100.00 FT (0.019 MILES) TO STATION 76+75.00 (MM 1.454). BRIDGE 14. WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES INSTALLATION OF A NEW PRECAST CONCRETE BOX CULVERT, HEADWALLS, WINGWALLS, SLOPE STABILIZATION, REMOVAL OF THE EXISTING CULVERT AND OTHER HIGHWAY RELATED ITEMS. Engineers Category C
Bid Protests Not Available