The project includes the complete tear-off of the existing shingle roofing system, removal of existing dormers, repair of existing wood soffits and fascia and installation of a new standing seam metal roofing system at seven (7) buildings located at Farmington Correctional Center (FCC). The buildings included in this project include the following: Medical Building #16, Food Service Building #17 A-side, Education Building #18 (Alternate #1), Library Building #19 (Alternate #2), Boot Camp Building #31 (Alternate #3), Chapel Building #32 B-Side, and Warehouse Building #33 B-Side (Alternate #4). Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email:
[email protected]. A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $75 that can be paid via credit card. All bids should be submitted using Missouri Buys at THIS WEBSITE.
Bid Protests Not Available