The Contractor shall provide all personnel, equipment, tools, materials, software, supervision, and other items and services necessary to perform CAD services as defined in this Performance Work Statement (PWS) for the Portland District (NWP) US Army Corps of Engineers (USACE). Drawing types include civil, structural, mechanical, and electrical disciplines. The focus of the requirement is accurate, high production CAD work services and should not be confused with design services. Services are not required to be performed at a physical USACE project site and rather will be performed at the Contractor’s place of business. The Contractor shall perform to the standards in the contract and comply with all local, state, and federal regulations during the services performed.
The period of performance for this firm fixed price contract will be 75 calendar days from award date.