General construction of wastewater pump station and forcemain including sitework, yard piping, process piping and equipment. Construction of a package Pump Station. Construction of sanitary forcemain. Sewer Lagoon closure. Providing traffic control for public and access for Contractors equipment. Obtaining all permits for construction of Work not obtained by Engineer or Owner. Removing all debris and excess materials from Project Site generated by construction Work. Restoring areas disturbed by construction to original condition or as specified by Contract Documents. Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email:
[email protected]. A hard copy set of documents is available for a NON-refundable deposit of $200, any check is payable to ADS and a copy can be emailed to us before you mail it. A download is available for a purchase of $150. Either can be paid online with a credit card. Shipping is an additional $35 ALL CREDIT CARD PAYMENTS ARE SUBJECT TO $5 CONVENIENCE FEE.
Bid Protests Not Available