We are replacing the old system with a new AHU and VAV system for the main building. We are also replacing the chiller at the Annex to serve both buildings now. See Attached: 15-21013 CD Specifications 15-21013 CD Drawings Vendor Profile W-9 Campus Map
Bid Protests Not Available