The project will replace approximately 4,000 linear feet of existing chain link fence with 9' high 3 strand barbed wire fence together with associated appurtenances as shown on the contract drawings. A mandatory pre-bid conference/site visit has been moved to be held on June 2, 2021, at 9:00 a.m. at the Chalk Bluff Water Treatment Plant; 9705 S. McCarran Blvd., Reno, NV. The Engineer's estimate is: $330,300-$403,700 This Project is deemed a Horizontal Construction Project.
Bid Protests Not Available