State Bid

Last Updated on 15 Feb 2022 at 5 PM
Carrollton Georgia

City of Carrollton Fire Station #23

Solicitation ID 81018-255
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Carrollton
Location Carrollton Georgia United states
This project involves site and building construction for the proposed Fire Station #23 located at 300 Centennial Drive. The site construction includes but is not limited to site demolition, clearing, grubbing, grading, maintenance and removal of erosion control BMP’s, utilities installation, storm drainage, pavement, curb and gutter, sidewalk, and landscaping/grassing. The building construction includes but is not limited to construction of approximately 7,450 square feet of building space along with complete mechanical, electrical, plumbing, and fire protection systems.
Bid Protests Not Available

Similar Opportunities

Colorado 12 Jul 2025 at 4 AM (estimated)
Colorado 12 Jul 2025 at 4 AM (estimated)
Gulf shores Alabama 10 Jul 2025 at 9 PM
Gulf shores Alabama 10 Jul 2025 at 7 PM