Point Of Contact Not Available
Bidding Instructions: 1. 180 Construction Schedule 2. Construction Start January 2, 2024 3. Contact us for more details on Site Walkthrough Conversion of Existing LA Fitness into a Club Studio, 2-Levels Totaling 46,000 Square Feet Division 2 Site: Minor Demolition for Remodeling, Site Furnishings Division 3 Concrete: Cast-in-Place Concrete, Cementitious Underlayment, Concrete Curbs Division 4 Masonry: N/A Division 5 Metals: Structural Steel, Steel Deck, Cold-Formed Metal Framing, Metal Fabrications, Fabricated Metal Stairs, Handrails and Railing Division 6 Wood and Plastics: Wood Treatment, Rough Carpentry, Architectural Woodwork, Solid Surface Countertops, Paneling Division 7 Thermal and Moisture Protection: Building Insulation, Vapor Retarders, Firestopping, Joint Sealers Division 8 Doors and Windows: Standard Steel Doors, Standard Steel Frames, Flush Wood Doors, Aluminum-Framed Windows and Doors, All Glass Entrances, Door Hardware, Glazing, Mirrors Division 9 Finishes: Lath and Plaster, Gypsum Board Assemblies, Tile, Acoustical Ceilings, Wood Athletic Flooring, Vinyl Sheet Flooring, Linoleum Sheet Flooring, Resilient Tile Flooring, Carpet, Sanitary Wall Panels, Paints and Coatings, Concrete Floor Sealer, Sound Absorbing Panels, Wall Covering, Graffiti Resistant Coating, Textured Coating System Division 10 Specialties: Metal Toilet Compartments, Wall and Corner Guards, Interior Signs, Phenolic Lockers, Plastic Laminate and Expanded PVC Lockers, Fire Extinguishers and Cabinets, Toilet Accessories, Self-Illuminating Exit Marking, Exterior Signs Division 11 Equipment: N/A Division 12 Furnishings: Floor Mats Division 13 Special Construction: Saunas, Laundry Room Equipment, Fire Alarm Division 15 Mechanical: Mechanical Demolition, Relocation and Alteration, Basic Piping Materials and Methods, Common Motor Requirements for HVAC Equipment, Mechanical Insulation, Fire Protection, Plumbing Fixtures, Plumbing Equipment, Domestic Water Heaters, Packaged Rooftop Air Conditioning Units, Terminal Heating and Cooling Units, Air Distribution, Fans, Testing, Adjusting, and Balancing (Melink required for testing and reporting). Division 16 Electrical: Electrical Demolition, Relocation and Alteration, Grounding and Bonding, Electrical Hangers and Supports, Electrical Identification, Building Wire and Cable, Wiring Devices, Floor Boxes, Electrical Utility Services, Variable Frequency Controllers, Enclosed Switches, Enclosed Circuit Breakers, Enclosed Controllers, Switchboards and Panelboards, Dry Type Transformers, Interior Luminaires, Low Voltage and CCTV Conduit System
Bid Protests Not Available