The Contractor will be responsible for providing any and all labor, materials, and equipment required to mill and resurface Solana Road from State Road (SR) A1A right-of-way, westward to Solana Woods Drive. The portion of intersection will be reconfigured at La Pasada Circle with new raised curbing. The Contractor shall install new paint striping and include up to eight (8) traffic loops at the SR-A1A/Solana Road Intersection, which will tie into the existing traffic signal. All work shall be performed at night. All Maintenance of Traffic (MOT) shall be provided for the duration of the project.