W9123624B5001
Craney Island Earthwork IDIQ
Portsmouth, Va.
This is a pre-solicitation notice. This is NOT a solicitation. Do NOT submit proposals or questions in response to this notice.
It is anticipated that the solicitation will be posted on Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil/ on or about February 2024. The solicitation is anticipated to be posted for 30 calendar days.
The U.S. Army Corps of Engineers (USACE) Norfolk District (NAO) intends to issue an Invitation for Bid (IFB) acquisition for the Craney Island Earthwork IDIQ project, Portsmouth, VA. This procurement will be conducted in accordance with FAR Part 14, Invitation for Bid (IFB). The not to exceed value of this IDIQ procurement will be $75,000,000.00
The Government intends to award a firm-fixed-price (FFP) contract. The requirement will be solicited as a 100% small business set-aside. The applicable NAICS code is 237990, Other Heavy and Civil Engineering Construction, with a small business standard of $45 million.
Description of Work
The Norfolk District, U.S. Army Corps of Engineers, is seeking eligible firms capable of performing site maintenance and improvements at CIDMMA. CIDMMA is a confined upland dredge material placement site located in Portsmouth, Virginia, adjacent to the Port of Hampton Roads. Work activities will include borrow area preparation for the purpose of dewatering saturated materials for future use, excavation, and reclamation of dredged material from prepared borrow areas, transport of reclaimed and borrowed materials, and construction of site improvement infrastructure projects with the material. The infrastructure projects on CIDMMA that may be built include, but are not limited to:
Contractor shall be responsible for before and after topographic surveys of the dike raising areas. All reclaimed material for the earthwork site improvements will be government supplied from on-site borrow sources. Total material volume placed is not expected to exceed 1,000,000 cubic yards per contract year. Construction techniques and equipment must accommodate soft and wet subsurface and fill soil conditions with high susceptibility to rapid and long-term settlements under instantaneous and sustained loading conditions.
Construction Time
Services to perform this work will be procured through an Indefinite Delivery Indefinite Quantity (IDIQ) Contract which will be a three-year contract. Task Orders under the IDIQ contract will be issued in accordance with site improvement needs and multiple task orders are expected to be issued during the contract period. The official synopsis citing the solicitation number will be issued on the System for Award Management website (Sam.gov) which will invite firms to register electronically to receive a copy of the solicitation when it is issued.
Definitive Responsibility Criteria
This requirement will use Definitive Responsibility Criteria (DRC) which are specific and objective standards established to inform the Contracting Officer. in accordance with FAR 9.104-2. These criteria will be used to assess whether the apparent low bidder can demonstrate the expertise and specialized facilities needed for adequate contract performance. The inability of a contractor otherwise eligible for award to demonstrate minimally acceptable experience as measured by the DRC may result in the Contracting Officer determining the contractor is not responsible.
The Definitive Responsibility Criteria is provided as follows:
This project requires construction and maintenance of containment dikes to retain placed dredged material within the Craney Island Dredged Material Management Area (CIDMMA). The CIDMMA consists primarily of un-drained cohesive soil conditions as described in the drawings and specification sections contained in Division 35 DIKE CONSTRUCTION, which will be included with the Solicitation. The Contractor shall demonstrate at least one project completed by the prime contractor, or their submitted earthwork subcontractor, in the past 5 years which involved excavation and building an earthen berm or structure upon cohesive soils.
The bidder shall provide the following:
If a subcontractor will be used to complete a work component of a bidder’s project experience, the bidder shall provide the following:
This notice does not constitute an invitation for bid. The IFB and accompanying documents will be issued electronically and will be uploaded to the Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil/ on or about February 2024. Notification of any changes to this pre-solicitation will only be made on this website. Therefore, it is the offerors responsibility to check the website regularly for any posted changes to the pre-solicitation notice, release of the solicitation, specification, drawings, and all subsequent amendments. Telephone calls or written requests for the IFB package will NOT be accepted. Prospective bidders are responsible for monitoring at https://piee.eb.mil/ to respond to the solicitation and any amendments or other information regarding this acquisition.
IT IS THE SOLE RESPONSIBILITY OF THE OFFEROR TO CONTINUALLY VIEW THE WEBSITE FOR CHANGES. No hard copies will be available.
Prospective bidders are responsible for monitoring SAM.gov to respond to the solicitation and any amendments or other information regarding this acquisition. Prospective bidders are required to be registered in SAM when submitting an offer and shall continue to be registered until time of award, during performance, and through final payment of any contract.
NOTE: Online Representations and Certifications Applications apply to this solicitation.
Inquires must be directed to Projnet in accordance with the forthcoming Solicitation document.