PROJECT LOCATION: This Project is located at: CSO 31: North of 300 Lakeside Avenue South CSO 150: Dead-end of 24th Avenue NW PROJECT DESCRIPTION: This Project consists of the following elements of Work at two separate locations: CSO 31: Replace existing outfall with an 8-inch high-density polyethylene (HDPE) pipe. The work will require a combination of pipe bursting and in-water work to install the new outfall pipe. CSO 150: Replace existing outfall with a 30-inch diameter high-density polyethylene (HDPE) pipe. Geotechnical investigations for this project have revealed petroleum hydrocarbon contamination at the site in excess of the Model Toxics and Controls Act (MTCA) cleanup levels, as well as several other contaminants.