The Project consists of the following: • Removal and replacement of existing inlets and storm pipe systems, including cleaning of existing storm pipes; • Installation of new inlets and catch basins; • Installation of new storm pipe systems; • Installation of three (3) underground stormwater management facilities (BMPs); • Installation of paving fabric and wearing course overlay of the roadway following select base repair shall be a project add/alternate to be performed at the Township’s discretion.