This project consists of the removal, disposal, re-installation, and restoration of forty-five cross drain culvert pipes located in the City of Palm Bayâs Port Malabar Unit (PMU) 23 and 56. This is a turnkey project and shall include all incidentals required to complete the project such as utility relocations, material furnishings, and restoration work associated with the installation of the culvert pipes identified in the attached design plans. All Maintenance of Traffic (MOT) costs required shall be included in the bid as part of the project construction cost. Where detour operations are planned, the contractor shall furnish plans to the City at least two weeks prior to implementation to allow adequate review and approval time. A pre-construction video shall be performed by the contractor to document existing conditions of each location prior to mobilization and shall be used for dispute resolution of any existing damage. Two copies shall be provided to the City for retention. 10% bid bond
Bid Protests Not Available