The 9th Contracting Squadron is soliciting a proposal for repair by replacement of two separate standby diesel generator systems. The Contract Line Item (CLN) for bid are identified as:
The Contractor shall provide a work plan for a complete and usable system within the negotiated and accepted contract construction cost and meeting all requirements of this statement of work. The government will not accept requests for additional funds unless approved in writing by the Contract Officer.
The work shall include removal and disposal of the existing standby diesel generator system Automatic Transfer Switch (ATS). The Contractor shall install a new Cummins 20kW generator system, complete with fuel tank, a Cummins Diesel compatible Bypass ATS, and specified appurtenances in accordance with (IAW) UFC 3-540-01, NFPA 70, and NFPA 110 and applicable references Specified in UFC 3-540-01. Contractor shall furnish all supervision, labor, tools, equipment, materials, operations, and incidentals required. Contractor shall perform all necessary connections to the generator and bypass ATS so that they are fully operational in accordance with all current NFPAs, DAFMANs, UFCs, State and local codes and regulations.
Magnitude: $500k to $1M
Site Visit: 22 July 2024
Meet-up Location for Site Visit will be at Beale AFB Visitor Center at Wheatland Gate (S Beale Rd, Wheatland, CA 95692)
Meet-up Time: 10:00 AM PST
*Site Visit is optional/Not mandatory. An Offeror does not need to attend the site visit in order to provide a proposal*
RFI Deadline: 23 July 2024, 1:00PM PST
Proposal Deadline: 26 July 2024, 1:00PM PST
24 July 24, Amendment 0001:
The purpose of this amendment is to incorporate additional work into the Statement of Need, and to upload further supporting documentation. The following changes are hereby incorporated into solicitation FA468624R0025:
1. Statement of Need (Attachment 1) now describes additional request (Page 4) to raise the existing concrete pads located at B845.
2. Site Plan now includes dimensions for B845 (Page 4).
3. RFI responses provided as Attachment 7.
4. Supporting pictures of B845 uploaded, listed as Attachment 8.
All other terms and conditions remain unchanged.