**8/7/2020 UPDATED COMBO**
The Contractor shall lease existing dark fiber, 2-strand, single mode fiber owned by Crown Castle Fiber that provides connectivity between the demarcation point for Hanscom AFB, Bldg. 1646A, and the demarcation point for MITRE Corporation, Building D (main distribution frame room), 202 Burlington Road, Bedford, MA. The Period of Performance is for one year of service with 4, one year option periods. The fiber transport connection must be terminated at both demarcation points. The Contractor shall maintain connectivity as described below throughout the contract’s
entire Period of Performance.