Federal Bid

Last Updated on 26 Sep 2018 at 8 AM
Sources Sought
Location Unknown

Degausser & Destroy Units with Duo Cart

Solicitation ID AFICAFA4452-18-R-0091
Posted Date 07 Sep 2018 at 12 PM
Archive Date 26 Sep 2018 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Fa4452 763 Scons Pkp
Agency Department Of Defense
Location United states
THIS SOURCES SOUGHT SYNOPSIS IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY.


This Sources Sought to determine the availability and technical capability of all small and large businesses (including the following subsets, Small Disadvantaged Businesses, HUBZone Firms; Certified 8(a), Service-Disabled Veteran-Owned Small Business and Woman Owned Small Business) to provide the required Degausser and Destruction Device on a mobile table.

Bid Protests Not Available

Similar Past Bids

Crater lake Oregon 25 May 2021 at 9 PM
Barksdale Texas 26 Jun 2014 at 7 PM
Location Unknown 13 Jan 2010 at 1 PM
Location Unknown 11 Sep 2014 at 8 PM

Similar Opportunities

Medical Science Building - 7E Renovation (CP2400920) On January 26th 2024 a fire and explosion occurred on the 7th floor of MSB in the east wing laboratories. Physical damage was extensive within the high impact area of approximately 5000 SF impacting interior construction including mechanical electrical and plumbing infrastructure, exterior windows, casework and finishes. ed and destroyed lab casework, and damaged interior finishes. More limited damage extended to other areas of the east wing. Existing windows, mechanical, electrical, plumbing, fire suppression, and fire alarm systems were damaged and will need to be replaced in the high impact area and partially replaced or repaired where the impacts of the incident extended to other areas of the 7thy floor. The repair project will return the 7th floor east wing to service for research. The project scope includes renovating approximately 11,800 square feet of high and low impact areas of the 7th floor. The project includes an alternate restroom renovation designed to meet current codes. Infrastructure repair and replacement includes wet pipe fire suppression, acid waste & vent stack replacement, sanitary waste & vent stack replacement, domestic water and lab water systems, lab gas replacement, plumbing equipment replacement, telecom infrastructure, and window replacement. Laboratory repairs include fume hood and laboratory replacement, and required laboratory sinks, eye wash, and infrastructure needed to support specialized laboratory equipment. The project will develop two separate sets of bid documents for competitive bidding, one of which will capture the preexisting laboratory build out and one that modifies the previous existing laboratory design to more closely align with ongoing lab renovations in other areas of the building and the long range masterplan for the Medical Science Building. Base Estimate & Alternates: $4,180,000.00
Location Unknown 29 Jul 2025 at 4 AM
Location Unknown 23 Jul 2025 at 4 AM