State Bid

Last Updated on 05 Feb 2020 at 11 PM
California

Demonstration, Recharge, Extraction and Aquifer Management - Mokelumne Aqueduct Tie-In

Solicitation ID 2148
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency East Bay Municipal Utility District
Location California United states
Point Of Contact Not Available
Wednesday, February 19, 2020, 1:00 PM The District will conduct a pre-bid jobsite inspection tour to familiarize prospective bidders with the project site and conditions. The inspection will be conducted on February 19, 2020 at 1 p.m. Bidders/bid walk attendees (Attendees) shall assemble at the District's Stockton office located at1804 W Main St, Stockton, CA; the tour will then proceed to the Mokelumne Aqueduct Station 1408 and the well site three miles north of Station 1408. If the bid walk is not possible on February 19 due to inclement weather, the alternative date for the bid walk will be on February 26, 2020 at 1 p.m. This is the only time that the Mokelumne Aqueduct Station 1408 and the well site will be open for inspection. The inspection will last approximately 2 hours. No photography by the Attendees will be allowed. The District will take photographs, as requested by the Attendees, restricted to the work zone. The District will release photographs to Attendees after the bid walk, pending review by the District. All Attendees are required to have a photo ID and sign a confidentiality agreement not to share, sell, or publish photos. The Prime Contractor and its subcontractors are strongly encouraged to attend the jobsite inspection where a "sign-in" sheet will be provided. Requirements of the District's Contract Equity Program including the Local Hire component will be discussed and explained at the jobsite inspection. At Mokelumne Aqueduct Station 1408: Furnish and install two precast concrete vaults and associated piping; modify fittings and piping in Aqueducts No. 1 and No. 2 vaults to add a furnished 6" tee and replace existing air release valves with furnished air release valves; rent and install a potable water equalization tank and provide water level instrumentation; furnish and install customer wooden power poles; construct site improvements; furnish and install a skid mounted packaged pumping system integrated with the PLC, instrumentation, piping, and valves; perform PLC programming and integration of the packaged pumping system; furnish and install radio and antenna; furnish and install approximately 220 feet of 8" ML&CS, 120 feet of 8" mortar lined and inorganic zinc coated steel pipe, 15 feet of 6" mortar lined and fusion bonded epoxy coated steel pipe, 10 feet of 6" mortar lined and inorganic zinc coated steel pipe. At the well site, about 3 miles north of Station 1408: Modify well control panel to start and stop the well pump remotely and install a 480 to 120-volt transformer inside the control panel; furnish and install valve position switches; furnish and install radio and antenna; furnish and install wooden pole; and perform related required work, located as shown on Drawings.
Bid Protests Not Available

Similar Opportunities

Washington District of columbia 14 Mar 2026 at 4 AM (estimated)
Washington District of columbia 14 Mar 2026 at 4 AM (estimated)
Washington District of columbia 14 Mar 2026 at 4 AM (estimated)
Washington District of columbia 14 Mar 2026 at 4 AM (estimated)
Washington District of columbia 24 Jul 2025 at 2 PM