The scope of the work is to replace the existing dissolved air floatation unit and chemical dosing system at a dairy processing facility in Middlebury. The replacement system must meet the following minimum requirements: 1) Treat 400 gallons per minute or more 2) All vendor equipment and chemical storage must fit within an existing 18’x22’ space with 10’ ceiling.
Bid Protests Not Available