A C-D ROM containing all applicable drawings will be available free of charge to contractors upon request no later than six (6) days from the solicitation issuance. The CD-ROM(s) contain WINDOWS compliant raster/vector formats (e.g. *.DWF, etc.)
All work will be performed at the vessels home pier in Galveston, Texas.
The Coast Guard intents to award a fixed- price requirements contract. The scope of the acquisition will include but is not limited to:
Chain Lockers, Clean and Inspect AND 100% Preserve
Tanks, (Aviation Fuel Service) Clean and Inspect
Tanks, (Aviation Fuel Storage and Overflow) Clean and Inspect
Tanks, (MP Fuel Service) Clean and Inspect
Tanks, (MP Fuel Storage and Overflow) Clean and Inspect
Tanks, (Lube Oil and Hydraulic Oil) Clean and Inspect
Tanks, (Potable Water) Clean ,Inspect and Preserve
Tank, (Ballast) Clean, Inspect and Preserve
Voids, (Accessible) Clean and Inspect
Tanks, (Dirty Oil) Clean, Inspect and Preserve
Vent Ducts, (Engine and Motor Room , All) Commercially Clean
Vent Ducts, (Galley and Pantry Room, All) Commercially Clean
Vent Ducts(Laundry Room Exhaust) Commercially Clean
Vent Ducts(All Other) Commercially Clean
Port and Starboard Anchor Windless, Inspect and Service
Anchor Chain(s) and Ground Tackle,Inspect,Repair and 100%
Warping Capstan, Inspect and Service
Control Air Dryer, Upgrade
Flight Deck Tie Down Fittings, Renew
Electronic Equipment Foundations, Renew
Structural Repairs
Crews Head, Refurbish
Vent Fans and Motors, Overhaul
Reverse Osmosis Desalination Plant Overhaul
Sounding Tubes(Fuel Tank) Renew
Fuel Piping, Renew
Lube Oil Piping, Repair
Oily Water Seperator Piping, Repair
Fire Main Piping, Renew
Piping(Counter Measure Wash Down System, Renew
Steam Valves and Piping, Renew
Towing Bits, Chocks and Fairleads, Inspect and Test
Sewage Piping, Renew
A/C Raw Water Piping and Valve, Renew
Composite Labor Rate
GFP Report
Travel and Perdiem
Potential sources that intend to submit an offer for this acquisition must fully demonstrate that they have the engineering capability, design and technical expertise to accomplish the requirements stated in the above paragraph and are to supply pertinent information in sufficient detail to demonstrate a bona-fide capability to meet the requirements. Evidence of experience in work similar in type and scope will be required, to include contract numbers, project title, dollar amount, points of contact and phone numbers.
The performance period is 64 calendar days, with a start date on or about January 3, 2012.