State Bid

Last Updated on 02 Apr 2024 at 5 AM
Mississippi

DPW-21654-ISU Repair Utility Tunnel

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Idaho Division Of Public Works
Location Mississippi United states
Point Of Contact Not Available
Removel of crew tunnel and install new walkable tunnel. Removal of 285 linear feet of craw tunnel and 327 linear feet of walkable tunnel. Install 435 linear feet of new walkable tunnel. Removal and replacement of the stairs/vault at the west entrance to the Administration Building. 1,342 linear feet of communications conduit bank, 1,654 linear feet of high voltage/communications conduit bank, 1,027 linear feet of high voltage conduit bank, along with pull boxes, vaults, and switch gear. Conduit banks to be installed by open trench or boring as per plans. Other improvements as per plans on the campus of Idaho State University, Pocatello, ID. Within the new tunnel system, the project will include: the replacement of the existing steam and condensate lines, update the ventilation system, add a sump pump, sidewalk & railing replacement, and make the connections of the new walking tunnel sections to the existing crawl and walking tunnel systems. Estimated Cost: $6,600,000
Bid Protests Not Available

Similar Past Bids

Range Alabama 30 Jul 2019 at 7 PM
Mississippi Not Specified
Mississippi Not Specified

Similar Opportunities

Boise Idaho 11 Jul 2025 at 6 PM
Seattle Washington 30 Jul 2025 at 6 PM
Ames Iowa 15 Aug 2025 at 4 AM (estimated)
Location Unknown 10 Jul 2025 at 3 AM