The scope of work shall consist of the mobilization of the contractor's workforce and equipment, construction site preparation, installation of a project sign, installation of sediment and erosion control measures, four (4) mine portal closures with wet seals and/or bat gates, installation of water treatment structures where necessary, installation of an underdrain and grass lined ditch, excavation and regrading, revegetation and clean up and repair of damages to the project site.