Point Of Contact Not Available
DRC-23F016.01 - AOCI Shower & General Renovations: Replace showers, toilets, urinals, lavatories, and restroom accessories as indicated. Remove floor tile, wall tile, prep ceiling and provide complete resinous system as indicated. Provide walls, doors, ceilings, and equipment in Building 6 for Vocational Programs. Replace plumbing fixtures, lighting fixtures. and exhaust scope as indicated. DRC-23F016.02 - AOCI Chiller Replacement: Remove existing chiller (patch roof, walls, and ceilings as needed) and provide chiller on equipment rails. Refer to MEP and structural drawings for details. Provide temporary chiller for facility use while replacement work is being completed.
Bid Protests Not Available