Remove, replace and clean HVAC ducts at building 7401 at AMARG, Davis-Monthan AFB. Remove exterior duct work off of ten (10) swamp coolers and install new duct work for nine (9) swamp coolers at building 7401 on Davis-Monthan AFB. One (1) swamp cooler will be "capped", or closed off. Reference Statement of Work (SOW) dated 26 April 2013. A site visit is scheduled for 22 May 2013 @ 10:00AM, local time. All contractors will meet at the Cracycroft Visitors Center at 9:30.
IMPORTANT: From May 13-16 all questions will be directed to SrA Marilyn Menjivar. The POC after May 16 is SrA Branden Reagan (contact information in posting). Contractors will include SSgt Mitchell Johnson at [email protected] on all correspondence (520 228-5441).
Bid Protests Not Available