Point Of Contact Not Available
The project consists of replacing three (3) walkovers with new wooden walkovers. This includes the demo and replacement of current walkovers, adding concrete walkways, replacing shallow deck areas, elevated deck section bracing, stairs, sitting areas and shower sections. All disturbed areas must be cleaned, graded and seeded. Walkovers will go to the dune line. Documents may be obtained via email or thumb drive from Procurement, 3231 Mr. Joe White Avenue, for a non-refundable fee of $50. Pre-Bid Meeting Date: 11/16/2021 10:00 AM
Bid Protests Not Available