Contractor shall provide all material, transportation, labor, equipment, coordination, planning, and supervision necessary design and install automation on the Electrocoagulation (EC) Units PLC’s located at facility 506A and Building 31. All work shall be performed in accordance with the contract specifications, this statement of work, drawings, and technical requirements.