State Bid

Last Updated on 11 Sep 2020 at 9 PM
Limited / Sole Source Justification
Charleston South carolina

Emergency Replacement of Two Air Cooled Chillers at the College of Charleston

Solicitation ID Not Specified
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency : College Of Charleston
Location Charleston South carolina United states
Point Of Contact Not Available
In accordance with the Emergency section 11-35-15700 listed in the South Carolina Consolidated Procurement, the College of Charleston is announcing the emergency contract award to Carolina Chiller Inc. for the replacement of two air cooled chillers at Tate and JC Long buildings. Both of the air cooled chillers that produce chilled water for the cooling system of the JC Long Building and Tate Building have failed. These failures have rendered the buildings unusable as an academic learning center. The urgency to replace the chillers to restore the HVAC system needs to be completed as soon as possible to maintain an effective learning environment for the Students. For additional details, please contract the buyer listed below. Bidder’s right to protest as listed in section 11-35-4210 in the South Carolina Consolidated Procurement Code applies to this intent to sole source. Protest to be filed with: Chief Procurement Officer Materials Management Office 1201 Main Street, Suite 600 Columbia, SC 29201 Facsimile: 803-737-0639 E-mail: [email protected]
Bid Protests Not Available

Similar Past Bids

Charleston South carolina Not Specified
Charleston South carolina Not Specified
Charleston South carolina Not Specified

Similar Opportunities

Mississippi 16 Jul 2025 at 4 PM
Philadelphia Pennsylvania 18 Jul 2025 at 6 PM
Philadelphia Pennsylvania 18 Jul 2025 at 6 PM
Vancouver Washington 16 Jul 2025 at 9 PM