State Bid

Last Updated on 22 Aug 2022 at 4 AM
ITB
Eugene Oregon

EUGENE ENHANCED WALKING NETWORK FEDERAL AID PROJECT

Solicitation ID 11713115
Posted Date 22 Aug 2022 at 4 AM
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Daily Journal Of Commerce
Location Eugene Oregon United states
Point Of Contact Not Available
CITY OF EUGENE EUGENE ENHANCED WALKING NETWORK FEDERAL AID PROJECT Bids due 2:00 pm, September 15, 2022 INVITATION TO BID BID NO. 13 Notice is hereby given that the City of Eugene, Oregon will receive electronic bids until Thursday, September 15, 2022, until the Bid Closing time of 2:00 p.m. on OregonBuys at the website https://oregonbuys.gov/bso. The Bid Opening will be virtual at 2:05 p.m., on Thursday, September 15, 2022, by Microsoft Teams, at which time and place those Bids will be opened and read. Bidders will be able to attend the bid opening by accessing the web version on Teams at: Click here to join the meeting Project: Eugene Enhanced Walking Network Federal Aid Project: 2385(107) ODOT KEY NO: 21159 900038 1 LS Mobilization; 1 LS Temp. Work Zone Traffic Control, Complete; 400 HR Flaggers; 1 LS Removal of Existing Pavement Markings; 3 EA Portable Changeable Message Signs; 1 LS Erosion Control; 1 LS Concrete Washout Facility; 15 EA Inlet Protection, Type 3; 1 LS Construction Waste Reuse and Recy cling (CWRR) Report; 1 LS Pollution Control Plan; 10 FT Removal of Pipes; 4 EA Removal of Inlets; 3 EA Tree Removal; 1 EA Stump Removal; 176 FT Mainline Video Inspections; 176 FT 10 Inch PVC Storm Drain Pipe; 5 EA Concrete Inlet, Type 4A; 4 EA Catch Basin, with Steel Bike Proof Grate; 1 EA Catch Basin, with Steel Wheelchair Proof Grate; 3 EA Minor Adjustment of Manholes; 28 EA Adjusting Boxes; 4 EA Connect to Existing Structures; 505 TN Level 2, ½ Inch ACP Mixture; 10 SY 4 Inch Asphalt Concrete Pavement Repair; 1,111 SY 8 Inch Asphalt Concrete Pave ment Repair; 5 EA Asphalt Speed Humps; 819 SF Plain Concrete Pavement, Undowelled, 12 Inches Thick; 1,888 SF Raised Concrete Crosswalk; 56 FT Concrete Curbs, Standard Curb; 1,487 FT Concrete Curbs, Curb and Gutter; 58 FT Concrete Curbs, 5 Foot Wide Curb and Gutter; 13 EA Weep Hole; 481 SF Concrete Islands; 3,114 DF Concrete Driveways, 5 Inches Thick; 12,194 SF Concrete Walks, Walks, 4 Inches; 419 SF Concrete Walks, Ramp, 7 Inches; 4,324 SF Concrete Walks, Ramp, 4 Inches; 485 SF Concrete Monolithic Curb and Ramp, 4" Thick; 302 SF Concrete Monolithic Curb and Ramp, 7" Thick; 162 SF Concrete Monolithic Curb and Driveway, 7" Thick; 2,180 SF Concrete Monolithic Curb and Driveway, 5" Thick; 18 SF Valley Gutter; 435 SF Truncated Domes on New Surfaces; 143 EA Bi-Directional Yellow Type I Marker; 1 LS Durable Longitudinal Pavement Mark ings; 1,271 SF Pavement Bar, Type D-HS; 5 EA Pavement Legend, Type D-HS: Speed Hump Stencil; 2 EA Pave ment Legend, Type D-HS: Bicycle Lane Stencil; 941 FT Curb Marking, Methyl Methacrylate; 13 EA Remove and Reinstall Existing Signs; 240 SF Signs, Standard Sheeting, Sheet Aluminum; 1 LS Illumination, Complete; 4 EA Adjust Junction Box, Minor; 10,476 SF Lawn Seeding; 3,704 SF Bark Mulch; 458 SF Rock Mulch; 1 EA Multiple Mailbox Support; 1 FA Irri gation Repair/Relocation All work must be completed by December 16, 2022 (single construction season) or by June 9, 2023 (split construction season). Plans and Specifications may be obtained online from the OregonBuys website. (See 00110.05(e)). The Agency reserves the right to issue Addenda making changes or corrections to the Plans, Specifications or quantities. The Agency will provide Addenda only by publishing them on the OregonBuys website. (See 00110.05(e)). No additional notification of addendum issuance will be provided. Submit bids to Jenifer Willer, City Engi neer as follows: Bids shall be accompanied by a bid guarantee as described in 00120.40(e). Filing of a qualification questionnaire before bidding will not be required. Contingent or conditional bids will not be considered for acceptance. No bid will be received or considered unless the bid contains a statement by the bidder that provisions of ORS 279C.800 to 279C.870. This project is a public works improvement project and is subject to ORS279C.800 to 279C.870 and Davis-Bacon Act. Bidders are required to submit a first-tier subcontractor disclosure form, substantially as described in ORS 279C.370, within two working hours of the bid closing date and time. No bid will be accepted by the City unless it contains a statement by the bidder as a part of the bid that the bidder in carrying out the contract will comply with all applicable laws. The City of Eugene is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the City of Eugene is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regula tions. The City of Eugene in accordance with Title VI of the Civil Rights Act of 1964, 79 Stat. 252, 42 U.S.C. 2000d to 2000-4 and Tile 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondis crimination in federally assisted program of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvan taged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin in considera tion for an award. Work performed by the Contractor's own organization must be at least 30 percent of the awarded contract amount. "Buy America" requirements apply on this project. This project is subject to the DBE policy statement as cited in 49 CFR 26. The DBE is subject to commercially useful function (CUF) requirements. When a DBE participation goal has been assigned on a contract, the contractor and subcontractor must comply with the commercially useful func tion (CUF) provisions. The CUF provisions require that the DBE actually perform, manage, and supervise all assigned responsibilities. Where on-the-job training (OJT) participation goals have been assigned, the contractor must comply with the relevant special provision requirements. Additionally, the contractor and subcontractor are subject to contract wage and equal employment opportunity (EEO) work force composition requirements contained in the affirmative action special provisions of each contract. 23 USC 140 EEO requirements. All bidders are notified that the DBE will be afforded full opportunity to submit bids in response to invitations to participate in any contract entered into pursuant to this advertisement. In consideration for an award, persons or firms will not be discriminated against because of race, age, color, sex, religion, national origin, mental or physical handicap, political affil iation, or marital status. DBEs listed by the bidder for participation in the contract must be certi fied as eligible DBEs as of the time of bid opening. This project contains a 6% DBE Goal. The City may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids or to waive any specification or requirement upon a finding of the City that it is in the public interest to do so. For more information regarding this project, contact Bryan Root at 541-501-0378 or [email protected]. Dated this 22nd day of August, 2022 Jenifer Willer, PE City Engineer Published Aug. 22, 2022. 12149035
Bid Protests Not Available

Similar Past Bids

Eugene Oregon 14 Sep 2022 at 4 AM
Eugene Oregon 22 Aug 2022 at 4 AM
Eugene Oregon 02 Dec 2022 at 5 AM
Eugene Oregon 06 Feb 2023 at 5 AM

Similar Opportunities

Pennsylvania 26 Jul 2025 at 4 AM (estimated)
Pennsylvania 26 Jul 2025 at 4 AM (estimated)
Pennsylvania 03 Aug 2025 at 4 AM (estimated)
Pennsylvania 03 Aug 2025 at 4 AM (estimated)
Alpharetta Georgia 31 Jul 2025 at 2 PM