a. Attachment 1E2 - PWS Enclosure 2, dated 2 January 2014 is replaced with Attachment 1E2 - PWS Enclosure 2, dated 9 January 2014.
b. Attachment 1E3 - PWS Enclosure 3, dated 5 September 2013 is replaced with Attachment
1E3- PWS Enclosure 3, dated 9 January 2014.
2. The proposal due date has changed from 1:00 PM CT on 24 January 2014 to 1:00 PM CT on 31 January 2014.
3. No other revisions are made.
The above amendment must be acknowledged per the instructions on Block 11 of the SF30.
Subject RFP is amended as follows:
Section J Attachment 1E2 - PWS Enclosure 2 - Key Documents has been revised.
Section L, Attachment L-6, and Section M have been revised.
Questions and Answers regarding the RFP issued on 5 December 2013 are attached.
The above amendment must be acknowledged per the instructions on Block 11 of the SF30.
Based on executing the current Air Force environmental restoration strategy, the Air Force's rough order of magnitude (ROM) for this PBR is anticipated to be between $10M and $15M. Offerors will not automatically be non-compliant if the proposed price exceeds the ROM.
Proposals shall be submitted in accordance with the RFP requirements and the date indicated in this announcement.
Copies of this solicitation are available by INTERNET ACCESS ONLY. All solicitation documents are posted with this announcement and made available for viewing in FedBizOpps (http://www.fbo.gov). Any amendments to the RFP (if required) will be posted in FedBizOpps. Interested parties are reminded that they are responsible for checking FedBizOpps for new information concerning this requirement.
Any communications with the Government from the date of this solicitation through contract award shall be directed in writing to the Procuring Contracting Officer (PCO), Ms. Linda L. Cavazos. Email correspondence shall be sent to Ms. Cavazos with a copy to the Contract Specialist, Ms. Christina Fernandez.
System for Award Management (SAM) Requirements:Offerors must be registered in the SAM database. If registration is not complete by date of award, the PCO will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration at https://www.acquisition.gov.
Environmental Insurance (EI):The Air Force is currently NOT proposing to require Cleanup Cost Cap (CCC) or any other type of Environmental Insurance (EI) for this PBR.
Organizational Conflict of Interest (OCI):An organizational conflict of interest may result when factors create an actual or potential conflict of interest on a contract, or where the nature of the work to be performed on the contract creates an actual or potential conflict of interest on a future acquisition. Some restrictions may apply to your firm under the proposed future action. This requirement requires offerors to address OCI issues. In accordance with the parameters set forth in FAR Subpart 9.5, the Contracting Officer must ensure that there are no conflicting roles that might bias a contractor's judgment and must ensure that an OCI does not give rise to an unfair competitive advantage. Performance of past clean-up related work at Fairchild Air Force Base may have created an OCI concerning this PBR effort. OCIs may exist in the following three ways.i. Technical Memorandum, Fairchild AFB, Site SS-39 Pre-Design Investigations.
ii. Technical Memorandum, Fairchild AFB Site SS-39 Injection Summary.
However, for site SD-37 (which is included in subject contract and this PBR), CH2M HILL delivered an initial draft technical memorandum that is not sufficient for the Air Force to post at this time. We intend to post some of the associated data attachments to the CH2M HILL Technical Memorandum, Fairchild Air Force Base, Site SD-37 Datagap Investigation and Analysis, however, without the full context of the associated technical memorandum, this presents a conflict of interest where CH2M HILL has access to site investigation not available to other Offerors.
CH2M HILL recently completed conducting optimization of Fairchild Air Force Base site LF002 remedy under contract FA4890-06-D-0007-0001. As part of that optimization, CH2M HILL built and operated site Soil Vapor Extraction and In-Situ Chemical Oxidation remedy optimization components. CH2M HILL representatives have stated they have all of the actual construction and operational cost data associated with the remedy optimization components readily available, but have not provided the information in their draft report of the optimization effort. This detailed information will be needed for the Fairchild Air Force Base site LF002 Proposed Plan and Record of Decision Amendment preparation, which is a required task of the PBR. This information has not been provided in a format readily available to other Offerors and therefore, potential Offerors will have to re-create by estimating all of the associated parameters and costs. Based on this, CH2M Hill has a conflict of interest because they have information that is not readily available to other Offerors.
Proprietary Information Shall be Properly Marked by Offerors. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations and Source Selection Procedures.
a. First and Last Name of visitor
b. Purpose of the visit, be concise and specific: Proposal drop-off
c. Date of visit and estimated duration of visit: (i.e., 1 hour meeting)
d. Location of visit: Bldg 171, Entrance 1
e. Drivers License number and state of issue
f. Company Name
The information provided will be forwarded to the 802d Security Forces Squadron. On the day of the visit, please confirm that your visitor information has been submitted to the 802d Security Forces Squadron. All visitors must report to the visitor center prior to entry.
THE PROCURING CONTRACTING OFFICE IS:772 Enterprise Sourcing Squadron (ESS/PKS)
2261 Hughes Ave, Ste 163
JBSA Lackland, TX 78236-9853
POCs:
Linda L. Cavazos, Contracting Officer, [email protected]
Christina Fernandez, Contract Specialist, [email protected]
______________________________________________________________________________
28 OCTOBER2013 - SOLICIATION NUMBER CHANGE
As of 28 October 2013, the Fairchild PBR solicitation number is changed from FA8903-13-R-0060 to FA8903-14-R-0004. All information will be posted to FBO under this NEW solicitation number.
Attached to this notice are the slides from the site visit held last week. Please note that questions regarding the site visit are due at 11:00 AM CST on 7 November 2013.
Site Visit slides will also be posted to the Google site.GENERAL INFORMATION
The Request for Proposal (RFP) and all applicable documents for the Fairchild Air Force Base Performance Based Remediation (PBR) solicitation have been posted/uploaded onto the FEDBIZOPPS website.