Point Of Contact Not Available
BIDS DUE: November 22nd @ 05:00 PM (EST) Subcontractors are to review ALL Drawings, Surveys, Specs and (if applicable) RFIs & Addenda. Subcontractor must acknowledge this on their proposal. GENERAL SCOPE OF WORK: Remodeling for a new Family dollar store. Project Type is a New Vanilla BOX. This scope of work includes Carpentry as per plans. Fixturing’s such as gondolas installation, check out etc. as per fixture plan in the specs. Installing interior signage and decals provided by Dollar Tree. Please be sure to review all plans, specs, photo map and surveys, addenda and/or RFIs. PROJECT DATES: Project start - 01/17/2022, 6-week construction schedule. TRADES INCLUDE: 05: Metal, Structural steel; 06: Millwork, FRP, Rough Carpentry, Finish Carpentry; 08:Doors, Frames and Hardware; 09: Flooring, ACT, Drywall, Paint, Wall Covering; 10: Wall Protection; 26: Electrical.
Bid Protests Not Available