Federal Bid

Last Updated on 06 May 2016 at 8 AM
Sources Sought
Lakeland Georgia

Fire Alarm System for Vigilant Warrior

Solicitation ID MAXWELL_F2X3CE6025A001_FIREALARMSYSTEM
Posted Date 19 Apr 2016 at 8 PM
Archive Date 06 May 2016 at 5 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Fa3300 42 Cons Cc
Agency Department Of Defense
Location Lakeland Georgia United states
Request for Information:

823rd Red horse

Response Deadline: 8 AM CST on 21 April 2016

42nd Contracting Squadron/LGCA-2

Contract Specialist: Michael Grayson

Contracting Officer: Marcus Abram

Maxwell AFB, AL 36112

THIS IS A REQUEST FOR INFORMATION IAW FAR 15.201(e). This notice is solely for market research and planning purposes and does not constitute a request for proposal, request for quote, or invitation for bid, nor does its issuance in any way restrict the Government to its ultimate acquisition approach. No award will be made from this Request for Information (RFI) and the Government will not pay for any effort expended in responding to this notice. The purpose of this RFI is to gather information from contractors on purchasing all necessary pats and equipment to acquire fire alarm systems. The contractor shall provide parts and installation IAW the Statement of Requirement (SOR). All feedback and information received may be used to determine the appropriate acquisition strategy for possible future acquisitions. Please do not request a copy of a solicitation because one does not exist.

Description of the Requirement: The Contractor shall provide all material and labor to install fire alarm and mass notification system for one (1) 4,500 sq. ft. K-Span assembly facility, eight (8) 968 sq. ft. lodging facilities, and six (6) 660 sq. ft. lodging facilities at the Vigilant Warrior Camp in Titus, Alabama. The contractor shall provide a fire detection, alarm system, and mass notification in each facility which connect to a Fire Alarm Control Panel (FACP) and Mass Notification Panel (MNP) in the Assembly Facility, for a total of Fifteen (15) facilities connected to one System. Each facility will have a Local Operating Console connected to the main MNP (Autonomous Unit (ACU)). The contractor must provide the items as specified in accordance with Attachment 1, Statement of Requirement and the following CLINs:
CLIN 0001: Parts and Equipment for Fire Alarm System for 4,500 sq ft K-Span Assembly facility IAW SOR paragraph 1.1.1-1.2.13.
Estimated Quantity: - 1 Each

CLIN 0002: Parts and Equipment for Fire Alarm Systems for eight (8) 968 sq ft lodging facilities IAW SOR paragraphs 1.2.1-1.2.13.
Estimated Quantity: 8 each

CLIN 0003: Parts and Equipment for Fire Alarm Systems for six (6) 660 sq ft lodging facilities IAW SOR paragraph 1.2.1-1.2.13.
Estimated Quantity: 6 Each

CLIN 0004: Installation for Fire Alarm System for 4,500 sq ft K-Span Assembly facility IAW SOR paragraphs 1.1.1-1.1.13.
Estimated Quantity: 1 Each


CLIN 0005: Installation for Fire Alarm System for eight (8) 968 sq ft lodging facilities IAW SOR paragraphs 1.2.1-1.2.13.
Estimated Quantity: 1 Each


CLIN 0006: Installation for Fire Alarm System for six (6) 660 sq ft lodging facilities IAW SOR paragraph 1.2.1-1.2.13.
Estimated Quantity: 1 Each

Questions: In order to develop a potential acquisition strategy this information is needed:
1) Does your company provide the items specified in attachment 1 Statement of Requirements and describe above? Please answer yes or no, if your company is capable of fulfilling this requirement as specified in the SOR.

2) If your company can meet this requirement, please answer the following questions in regards to the non-manufacturer:

a. Is your company a small business? Will your company perform 50% of the cost of manufacturing?

b. Will at least 50% of the products required to meet the requirement be purchased from U.S. owned Small Business? So, will 50% of the products required to meet this be manufactured by a small business.

3. Project Milestone Plan (PMP). The contractor shall provide a PMP that shows a timeline from issuance of the contract to delivery of the Fire Alarm System to the delivery solicitation. The PMP may be expressed in terms of "days after contract award". The PMP shall include, at a minimum, a timeline for Ordering, Delivery, Installation and Contract Completion.
4. Please provide how much lead time will be required to meet this requirement from the date of contract award.

Description Days After Contract
Product Design
Product Ordering
Product Delivery
Product Installation
Total Days Required to complete Project

Responses: This RFI is prepared for planning purposes only and is not restricted to small business. If the government decides to pursue an RFP, portions of your RFI response may be incorporated into the Statement of Requirement (SOR), sources are discouraged from submitting any information deemed competition-sensitive or proprietary. However, if sources elect to submit competition-sensitive or proprietary information, sources bear sole responsibility for marking said information as such to ensure appropriate safeguarding by the Government. The Government shall not be held liable for any damages incurred if proprietary information is not properly identified. All submissions become Government property and will not be returned.
1) RFI responses must include company name, address, cage code, DUNS number, at least one designated point of contact, voice, and fax telephone numbers, and an email address.
2) All questions and responses to our request for information/questions shall be submitted, via e-mail, to [email protected]; [email protected].

3) All responses are due by email no later than 8 AM CST on 21 April 2016.

Primary POC ALT POC
Name: Michael Grayson Marcus Abram
Phone #: (334) 953-0530 (334) 953-3526
E-mail: [email protected] [email protected]

Bid Protests Not Available

Similar Past Bids

Lakeland Georgia 19 Sep 2018 at 5 PM
Lakeland Georgia 14 Sep 2018 at 10 PM
Lakeland Georgia 14 Sep 2016 at 9 PM
Location Unknown 02 Aug 2018 at 7 PM
Warrior Alabama 22 Mar 2010 at 4 PM

Similar Opportunities

Colorado 24 Jul 2025 at 4 AM (estimated)
Colorado 24 Jul 2025 at 4 AM (estimated)
Pennsylvania 28 Jul 2025 at 4 AM (estimated)