Point Of Contact Not Available
The fabrication of an aluminum floating dock and gangway per the attached drawings. Installation is not required. • Provide shop drawings for final approval prior to fabrication. • Provide District with estimated fabrication and delivery schedule. • Fabricate an 8’ x 30’ aluminum floating dock per the attached drawing. • Fabricate a 5’ by 30’ aluminum gangway per the attached drawings
Bid Protests Not Available