The scope of work includes, but is not limited to: modifications to two (2) existing traffic signals and installations of two (2) HAWK traffic signals along the Fresno Avenue Corridor. The project also includes minor slurry sealing, pavement grinding, pavement restriping, and signage. The project also includes upgrading of pedestrian heads to Countdown type pedestrian signal heads along the Fresno Avenue corridor.
Bid Protests Not Available