Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the demolition and proper disposal of the existing wood bridge and abutments, the procurement of a pre-fabricated steel structure bridge as specified in the Specifications, construction of abutments designed by the bridge manufacturer, installation and finishing of the new steel structured pre-fabricated bridge as well as the repair and repainting of a second small pedestrian bridge.
Bid Protests Not Available