The work necessary for the completion of this contract consists of removing and replacing existing wooden planters, wooden arches, light fixtures, electrical conduit, irrigation lines, irrigation valves and controller, and irrigation drain pipe system and planting new flowers on the Goldenrod Pedestrian Bridge.
Bid Protests Not Available