This project consists of construction of a water main under Great Miami River via Horizontal Directional Drilling (HDD). Approximately 1,141 of 30 inch and 24 inch water main will be installed between Cincinnati St and Arbor Blvd. 1000 feet will be via HDD.
Bid Protests Not Available