Contractor shall provide all personnel, equipment, tools, material, transportation, labor, and supervision required to build and install a two-story modular HAZMAT trainer and attach it to an existing concrete pad. Please see attached combo and other attachments for specifics.
----------------------------SITE VISIT INFORMATION---------------------
_______________________________________________________________________________________
A site survey will be conducted on Monday, 20 July 2020 at 2:45 PM Local (Central Time). Interested vendors must submit their representative's information by Tuesday, 14 July 2020 by 12:00 PM Local, information shall include: representative's full name; date of birth; driver's license state of issue and number; and last 4 of their SSN. Vendors will be limited to one representative in attendance.
Representative submitals for base access should be sent to SrA Joseph Montgomery at [email protected] and MSgt Andre Casiano at [email protected].
Representatives shall adhere to CDC COVID-19 guidance, to include the mandatory use of face-masks and social distancing while on Goodfellow AFB. Face-masks must be worn at all times and will not be provided; representatives will not be allowed on base without a face-mask.
___________________________Amendment 0001___________________________
This amendment corrects the offer due date on the combined synopsis solicitation to reflect 31 July 2020 @ 4:30 p.m. Central Time and to delete the concept drawings as they were not applicable to the basic hazmat trainer
________Amendment 0002 Q&A Posting/Attachment 3 Concept Drawing_________
Q&A #1 has been posted and Attachment 3 has been added as an updated conceptual drawing
_________________________Q&A Announcement____________________________
All questions regarding this solicitation are due 23 July 2020 at 1:30 p.m. central time. Once
answered Q&A #2 shall be posted
_____________Amendment 0003 Quote due date extension______________________
The due date for quotes is hereby extended until 6 Aug 2020 at 4:30 p.m. Central Time
The government anticipates Questions and Answers to be posted by 29 July 2020. This
may result in minor changes to the SOW.
______________Amendment 0004 SOW Revision and Q&A 2 Posting_______________
SOW has been revised based on vendors' questions. SOW titled "Attachment 1 - Basic Course HazMat SOW Rev 1 29 July 2020" replaces the previous SOW. In adddtion, Q&A #2 is hereby posted.