The objective is for the contractor to deinstall the six (6) existing cubicles which includes data and electrical. The contractor will procure, ship and install an open concept bullpen area with four (4) modular workstations and a walled office area to include electrical outlets and network data lines for each workstation and office.
The contractor shall provide all labor and equipment to support the installation of this new centralized operations area. The contractor shall also remove and dispose of all pre-existing furniture, as directed by the Government.
Please see the attached SOW for further information.