The work consists of furnishing all labor, materials, tools, equipment, and incidentals as required by the Specifications, and Contract Documents. The general items of work include installing and removal of fall protection systems for construction work, removal of the existing center access hatch, removal of the existing concrete curb, installation of the recommended curb repair, repair of the previously applied interior surface coating of the digester roof, and reinstallation of the access hatch, per specifications.
Bid Protests Not Available