State Bid

Last Updated on 13 Mar 2020 at 11 PM
RFP
Camarillo California

HCTP Retaining Wall Project

Solicitation ID CI 5444
Posted Date Not Specified
Archive Date Not Specified
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Thousand Oaks
Location Camarillo California United states
Provide professional consulting services consisting of preparation of a preliminary design report (PDR) relating to the existing retaining wall at the Hill Canyon Treatment Plant (HCTP) and proposed replacement, preparation of replacement design documents and bid and construction phase services. The work will be completed in two phases: 1) Design Phase entails preparation of construction documents (plans, specifications, engineer’s estimate), and engineering services during the bid process; 2) Construction Phase (not a part of this proposal) entails providing engineering support service during construction of the project. All services shall be provided in accordance with this Request for Proposals/Qualifications (RFP/Q), per specifications. Copies of the RFP/Q Package may be obtained by contacting Jon Turner, PE at 805-658-6800, or [email protected], or visiting the city’s website. Proposers are required to register with the City prior to downloading bid documents from the website and to be eligible to submit a proposal.
Bid Protests Not Available

Similar Past Bids

Camarillo California Not Specified
Thousand oaks California Not Specified
Thousand oaks California Not Specified

Similar Opportunities

Camarillo California 15 Jul 2025 at 6 PM
Camarillo California 19 Jul 2025 at 4 AM (estimated)
Camarillo California 18 Jul 2025 at 4 AM (estimated)
Camarillo California 18 Jul 2025 at 4 AM (estimated)
Camarillo California 12 Jul 2025 at 4 AM (estimated)