The Continental Divide National Scenic Trail (CDNST) - Greenhorn Reroute # 337 consists of the following work: The Continental Divide National Scenic Trail will be approximately 1.8 miles of new trail construction. The trail will be constructed to hiker, pack and saddle standards. Tread width will be 30 inches. All aspects of trial construction will be included in this project. Clearing and grubbing, excavation and embankment, rolling dips/grade dips, switchbacks, check dams, climbing turns, water bars and obliteration of abandoned trail ways are all included in this project. Grade dips and grade reversals such as climbing turns will be incidental to new tread excavation. Machine construction will be a requirement on this project. Pre work inspection of all machinery used will be required. Terrain is not exceptionally rough but there will be a considerable amount of rock that will slow construction.
Please return all quotes either via email at
[email protected] or mail to:
US Forest Service
Attn Trevor Mattson
1820 Meadowlark
Butte, Mt 59701
Response due Friday June 3rd, 2016 17:00 MST
Bid Protests Not Available