The construction of an 8-foot wide asphalt pedestrian and bike trail from the intersection of Van Buren Street and Worldgate Drive to the existing Herndon Metrorail Station pavilion entrance. Including modifications of the existing pedestrian facilities located within the intersection to improve pedestrian and bicycle access to the proposed trail. This is a lump sum contract. Contract length is 270 calendar days to date of Substantial Completion.
Bid Protests Not Available