The contractor shall create the geometry, mesh and computational fluid dynamics (CFD) models for the U.S. Department of Energy (DOE) horizontal dry cask simulator containing one Boiling Water Reactor (BWR) assembly. The model must use the same validation methods Alden Research Laboratory, Inc. applied to the model developed for the TN-32 dray cask storage systems held at North Anna power plant. The CFD model will be benchmarked against observed thermal data obtained from DOE's Sandia National Laboratory. Additionally, uncertainty quantification (UQ) of the target variables such as, peak cladding temperature (PCT), cask walls heat transfer, structural temperature profiles, maximum axial temperature profile and air cooling mass flow rate shall be performed using the same methods Alden Research Laboratory, Inc. used for the TN-32 model.
The results of this work will assist NRC in reviewing designs of dry cask storage systems that are expected to increase in technical complexity and heat load and determining the adequacy of the applied analytical method.
This Notice of Intent is NOT a request for proposal NOR a solicitation of offers; however, if any interested party believes they can meet the above requirement, it may submit a statement of capabilities. The statement of capabilities must be submitted in writing and must contain material in sufficient detail to allow the government to determine if the party can perform the requirement. Additionally, in order to perform work for the NRC potential sources must be free of organizational conflict of interest (OCOI). For information on the NRC COI regulations, visit NRC Acquisition Regulation Subpart 2009.5 (https://www.nrc.gov/about-nrc/contracting/48cfr-ch20.html).
A determination not to compete this proposed procurement based on responses to the notice is solely within the discretion of the Government. All interested parties must express their interest and capabilities in writing via email to Jennifer Dudek, Contract Specialist via e-mail at [email protected] no later than August 21, 2019 by 4:00 P.M. Eastern Time (i.e. 7 calendar days from the date this announcement was posted).